Current Projects
As mentioned throughout the site,
the District is currently in the process of construction
of a million-gallon water storage reservoir south of
Sullivan Road (in Section 35)and a two-million gallon
water storage reservoir south of Samarkand Drive (in
Section 24). Other improvements will include three
booster pump stations associated with the reservoirs and
approximately 43,000 linear feet of 12-inch diameter
pipeline along existing road and pipeline right of way.
The million gallon reservoir will
provide water storage in an area that did not have any.
Both reservoirs and the associated pipelines will enhance
system reliability and fire flows in those areas.
The additional water source to the Lear area will enhance
system reliabilities to a very large portion of the
District. The combination of these improvements will
give the District the ability to accept and deliver water
from the recently completed fluoride removal plant to the
entire District ensuring adequate water supplies far into
the future. |